
Hobbywing XRotor Pro 40A 3-6S Brushless ESC Speed Controller for RC Multirotor – Long Lead (2PCS)
by HHCI
Rs. 8,158.40
SKU HHCI0028
Description:
Hobbywing XRotor Pro 40A 3-6S Brushless ESC Speed Controller for RC Multirotor – Long Lead (2PCS)
Features :
Special core program for multi-rotor controllers greatly improves throttle response.
Auto Timing Adjustment and Preset Parameters for easy operation.
DEO (Driving Efficiency Optimization) technology significantly improves throttle linearity and driving efficiency.
Open Cooling Fin.
Special core program for multi-rotor controllers greatly improves throttle response.
Auto Timing Adjustment and Preset Parameters for easy operation.
DEO (Driving Efficiency Optimization) technology significantly improves throttle linearity and driving efficiency.
Open Cooling Fin.
Specification :
- Output : Continuous 40A, Burst 60A up to 10 seconds
- Input Voltage : 3-6cells lithium battery
- BEC : NO BEC
- Refresh rate of the throttle signal : up to 621Hz
- Timing : High or Intermediate
- Red Black cable length : 475mm
- Signal cable length : 560mm
- Bullet Connector : 3.5mm
- Size : 73.5 x 23 x 11mm
- Weight : 45g
Package Includes :
2 X Hobbywing XRotor 40A Pro ESC (OPTO)
1 X English Manual
2 X Hobbywing XRotor 40A Pro ESC (OPTO)
1 X English Manual